King Sabata Dalindyebo Municipality

Supply, Installation, Testing, and Commissioning of the Schweitzer Engineering Laboratories (SEL- 487E) Protection Scheme for the 20 MVA 66/11 kV Transformer No. 3 at Unitra Substation, including H-Frame and Low Voltage (LV) Bus Support for a period of six (06) months Unitra Substation, including H-Frame and Low Voltage (LV) Bus Support for a period of six (06) months WITH A 5 EP or higher. (Re-advert)

01jun10:52 am09jul(jul 9)10:52 amSupply, Installation, Testing, and Commissioning of the Schweitzer Engineering Laboratories (SEL- 487E) Protection Scheme for the 20 MVA 66/11 kV Transformer No. 3 at Unitra Substation, including H-Frame and Low Voltage (LV) Bus Support for a period of six (06) months Unitra Substation, including H-Frame and Low Voltage (LV) Bus Support for a period of six (06) months WITH A 5 EP or higher. (Re-advert)

Submission Timeframe

June 1, 2026 10:52 am - July 9, 2026 10:52 am(GMT+01:00)
View in my time
Skip to content